Data Center Needed in a Remote Location


Large American Cruise Line in need of remote site Data Center

Challenges:  A Large US-Based Cruise Line was in need of a simple way to deploy their IT   equipment at one of the many island ports.  The way they deployed IT to these ports in the past was expensive and time-consuming.

Solution: Working with the company’s architects, EMS helped to design a “hurricane-proof server shack” at the Bahamas location that perfectly managed the environmental requirements for the product. Since the company could preconfigure the IT equipment in the US, it was able to simply install the solution in the shack upon completion.

Benefits: Simplified and streamlined deployment due to preconfiguring each Raser DX centrally and deploying remotely; capital expense savings, and environmentally sound in a harsh environment.

RC RC2